登录
注册
欢迎来到在线题库搜索
作业考试题库搜索平台
搜索答案
网站首页
会员联系qq:84302438 (仅限VIP会员,周一到周五12:00-18:00)
智能AI论文生成
当前位置:在线题库搜索>
[单选题]()is the general meaning of the contract, bill, note and proof in the process of logistics.的答案是什么?
问题:
[单选题]()is the general meaning of the contract, bill, note and proof in the process of logistics.
参考答案: B
报错
相关题目:
()i the general me
__________ i the a
Muic i the only la
Generally peaking,
According to Hed
相关内容
●
Apart from pecial contract or tatute every Shipowner i()a liability akin to that of a common carrier,irrepective of whether the good were hipped by a Charterer or on a general hip.
●
A project life cycle i a collection of generally equential project ( ) whoe name and number are determined by the control need of the organization or
●
()mean any peron by whom or in whoe name or on whoe behalf a contract of carriage of good by ea ha been concluded with a carrier,or any peron by whom or in whoe name or on whoe behalf the good are actually delivered to the carrier in relation to the contract of carriage of good by ea.
●
If he i a common carrier,he i abolutely reponible to the owner of the good carried ()any lo or damage to them unle caued by an Act of God or the Queen’ enemie,or the inherent vice in the good themelve,or the negligence of the owner of the good,or a general average acrifice.
●
During loading or dicharging,where the delay i due to the Shipowner’ fault,or that of hi ervant or agent acting within their authority,the time actually delayed i to be()in calculating lay day.
●
Owner are to be reponible for lo of or damage to the good or delay in delivery of the good only in cae the lo,damage or delay ha been caued by the improper or negligent towage of the good.Thi mean that().
●
Where a container,pallet or imilar article of tranport i ued to conolidate good,the number of package or unit enumerated in the bill of lading a packed in uch article of tranport()to be the number of package or unit in calculating the amount beyond which the carrier or the hip i not reliable.
●
The carrier i liable for lo of or damage to the good or delay in delivery caued by fire,()the claimant prove that the fire aroe from fault or neglect on the part of the carrier,hi ervant or agent.
●
Utterance i baed on ();it i the realization of the abtract meaning of a entence in a real ituation of communication,or imply in a context.
●
● The peronal computer or (72) i the mallet general-purpoe computer.(72)
●
The peronal computer or______i the mallet general-purpoe computer.
●
● The peronal computer or (72) i the mallet general-purpoe computer.